Tag: road markings

  • Construction Bicycle Lane Markings

    Construction Bicycle Lane Markings

    Another Sunday — Oops! Make that Monday — and time for another longer ride.

    Today’s ride found roads I haven’t biked on before and more hills. As a bonus, I biked on a newly repaved section of a road that hadn’t been formally re-striped. For the interim, someone with some spray paint and a sense of humor painted hatch marks for lane dividers and these delightful bike lane markings.

    Screen Shot 2016-02-28 at 6.33.39 AM

    Ride summary:

    Distance36.03 miles
    Actual Time Moving2:24:08 h:m:s
    Average Speed14.9 mph
    Maximum Speed32.8 mph

    I should admit that “Smokin’” was from another construction zone, but the style is unmistakably similar.

    I wonder if these markings comply with the Manual on Uniform Traffic Control Devices. ;-)

    Summary of last week:

    Distance70.49 miles
    Actual Time Moving4:57:23 h:m:s
    Average Speed14.2 mph
    Maximum Speed28.1 mph

Search

Stuff

Made with

in

to

Copyright 2004-2023 Brent Logan

Thanks for visiting!

Brent Logan